ABOUT

Our History

Explore the history of Beyond Energy. From humble beginnings to global impact.

  • 2015

    • Dec

      Beyond is incorporated in Alberta, Canada

  • 2016

    • Jan

      Started construction of first 5 MPD packages

    • Nitro MPD Package

      Feb

      Nitro MPD package released

    • Nitrogen Backpressure System

      Feb

      Nitrogen Backpressure System patented

    • Aug

      Started operations in Alberta

  • 2017

    • Lightning Classic H

      May

      First Beyond MPD Control Panel developed (Lightning Classic H)

  • 2018

    • Apr

      First beyond RCD model (Titan 3) developed

    • Beyond's patented skid walking system structure with skids and cross beams

      Apr

      Released Skid Walking System

    • Mud_Gas_Separator

      Apr

      Self-erecting Big-B

    • May

      Started operations in Alaska

    • Nov

      Started operations in Texas

  • 2019

    • Jan

      Second Beyond RCD model (TITAN 5) developed

    • Jan

      Started operations in Indonesia

    • Nov

      Compact MPD packages deployed to the USA

  • 2020

    • May

      First Beyond MPD Package in Mexico

    • Mar

      Release of ARES 3078 Single/Dual Bearing Assembly

    • Sep

      Beyond’s First offshore MPD job

    • Globe and Mail Canada's Top Growing Companies Award

      Sep

      Globe and Mail, Canada's 2020 Top Growing Companies Award

    • Lightning Control Panel

      Dec

      MPD Electric Panel developed (Lightning)

  • 2021

    • Jan

      ATLAS Marine Offshore RCD Released

    • Minerva Hydraulics

      Feb

      First Beyond Drilling Hydraulics simulation software released “Minerva Hydraulics™”

    • Mar

      Release of ARES 3090 Single/Dual Bearing Assembly

    • May

      First Beyond Offshore Manifold Building released

    • Aug

      Started offshore operations in Ivory Coast

    • Aug

      ATLAS Marine Offshore RCD deployed in Equatorial Guinea

    • Dec

      Beyond performed its 100th job

  • 2022

    • Feb

      Started operations in Kurdistan (Iraq)

    • Mar

      Utilized MPD on an Offshore platform in the Cook Inlet of Alaska

    • Aug

      Received the “Focus on Execution” award from a valued client within their supplier recognition program

  • 2023

    • STREICHER

      Jan

      Partnership with STREICHER Drilling Technology GmbH

    • Well Control School

      Jan

      In-house MPD training started in partnership with Well Control School

    • Feb

      Received the Managed Pressure Drilling Experts of the Year from Corporate Vision’s Canadian Business Awards

    • Mar

      Completion of ATLAS Casing Stripper

    • Mar

      100th TITAN RCD manufactured

    • Apr

      Awarded Offshore Newfoundland MPD

    • Aug

      TITAN RCD enters the Argentina market

  • 2024

    • Feb

      ORION RCD Hydraulic Clamp commercial release (TITAN 5)

    • Blackfalds facility

      Jun

      Opening of the Blackfalds, Alberta facility

  • 2025

    • MPD Lightning Electric Control Panel

      Sep

      Advanced MPD Control Panel (Lightning Electric)

    • Athena MPD Package

      Oct

      Launch of Athena MPD package

    • Bearing Cooler

      Nov

      RCD Bearing Cooler Unit

    • EY Award

      Oct

      EY Entrepreneur of the Year - Prairies Finalist Award

  • 2026

    • Best Managed Companies

      May

      Recognized as one of Canada's Best Managed Companies